Published OCT 20, 2026

Municipal Water & Wastewater Mechanical Contractor, Pittsburgh PA

Pittsburgh, Pennsylvania

$3.0M
Revenue
$557K
SDE
2.3x
Multiple
Subscribe Free

Read the full deal writeup

Sign up for a free Accredited account to read the editorial writeup, financials, and broker contact for this deal.

Already a member? Sign in

Full Editorial Writeup

This is a Pittsburgh-based heavy civil and mechanical construction contractor serving municipal and industrial water and wastewater infrastructure clients. Founded in 2012, the business built its reputation on electrical and mechanical construction, then expanded into control-system integration, mechanical piping, tank-support work, site development, earthmoving, and concrete construction. In recent years it has deliberately tilted its mix toward heavy civil, concrete, earthmoving, and site work while pulling back from electrical contracting and SCADA/telemetry work, a strategic repositioning toward higher-asset, higher-barrier work.

The company does roughly $3.0M in revenue with $557K in cash flow, an 18.7% owner-earnings margin that is healthy for a heavy civil contractor. The work is tied to non-discretionary municipal water and wastewater needs: aging treatment-plant assets, storage-tank rehabilitation, pump and control modernization, and regulatory compliance. That demand is further underwritten by federal and state financing programs for drinking-water and wastewater infrastructure, which gives the backlog a funded, defensible quality.

The sale includes $602,000 in assets, much of it heavy equipment, plus permitted land included in the purchase on which a buyer can begin building a new office/warehouse immediately. With an eight-person full-time team, SBA eligibility, seller financing on the table, and a retiring owner willing to stay on, this is a tidy infrastructure-services acquisition priced at 2.33x cash flow.

Why we like it

  • Earnings quality is solid for the category: $557K of cash flow on $2.98M revenue is an 18.7% margin, strong for heavy civil where single-digit margins are common. At a $1.3M ask that is 2.33x cash flow, and SBA eligibility means a buyer can control this with modest equity and let the business service its own debt.
  • The moat is in the work type and the customer base. Municipal water and wastewater contracting involves bonding, prequalification, and a track record that new entrants cannot replicate overnight, and the deliberate shift toward concrete, earthmoving, and heavy civil leans into higher-asset, less-commoditized work.
  • Market tailwinds are unusually durable here. Aging municipal infrastructure, treatment-plant upgrades, storage-tank rehab, and regulatory compliance drive demand that is funded by continued federal and state financing programs, meaning the spend is politically protected and largely counter-cyclical.
  • Operator advantage is real for the right buyer. The deal includes $602K in assets and permitted land ready for immediate warehouse construction, a retiring seller offering an extended handover, and seller financing available, which de-risks the transition and the balance sheet simultaneously.

How to improve it

  • Audit the backlog and bid pipeline in the first 90 days and quantify how much revenue is already contracted versus newly won each year. Heavy civil lives and dies on backlog visibility, and knowing your coverage lets you prioritize bonding capacity and crew scheduling before you commit to growth.
  • Rebuild bonding and prequalification relationships to raise the ceiling on project size. If the current owner is capped at smaller jobs by surety limits, increasing capacity lets you bid larger municipal contracts at better margins without changing the core competency.
  • Formalize a maintenance and rehabilitation retrofit program for existing municipal clients. Storage-tank rehab, pump modernization, and compliance work are repeat needs, and packaging them into scheduled service agreements can convert project revenue into more predictable, higher-margin repeat work.
  • Complete the permitted office/warehouse buildout on the included land to consolidate operations and equipment. A proper yard improves equipment utilization, reduces downtime, and gives you the physical footprint to add crews as you scale.
  • Build a dedicated estimating and business-development function to reduce reliance on the owner. The owner is retiring and the ask highlights absentee potential, so investing in a systematized bidding process is the single biggest lever to make this manager-run.
  • Review equipment utilization on the $602K asset base and decide what to run, rent, or retire. Idle heavy equipment is dead capital in this business, and either sweating or shedding underused machines directly improves return on the assets you just bought.

Diligence notes

  • Scrutinize customer and project concentration. A $3M heavy civil shop can hinge on a handful of municipal contracts, so pull a three-year schedule of jobs by client and confirm no single customer or project carries an outsized share of revenue or margin.
  • Validate the cash flow against completed-contract accounting. Construction SDE can be distorted by work-in-progress, retainage, and timing of billings, so reconcile the $557K to tax returns and look at a work-in-progress schedule to confirm earnings are real and not front-loaded.
  • Confirm the condition, titles, and liens on the $602K in heavy equipment. Verify each major asset is owned free and clear, assess remaining useful life and deferred maintenance, and get an independent appraisal since a large chunk of the purchase value sits in these machines.
  • Clarify exactly what land is included and its permitting and development costs. The listing says permitted land for a new office/warehouse is part of the deal, so verify the parcel, zoning, permit validity, and the all-in cost to actually build before crediting it as value.
  • Assess bonding capacity, surety relationships, and key-employee risk. With only eight employees and a retiring owner, confirm which licenses, prequalifications, and relationships transfer, and identify whether any single field or estimating lead is irreplaceable to ongoing operations.

Source

Originally listed on BizBuySell. View original listing →

Want the full analysis on every deal? Unlock the complete platform with Accredited Pro to screen live listings and read our operator-level writeups.